-
Current 9th School Alternative Site Study: November 2017 - May 2018
Materials, Presentations, and Studies Related to 9th School Alternative Site Study Final Report
- Video of June 13 Joint Board Meeting and Final Site Selection
- HMFH Study Final Presentation to Joint Boards - June 6, 2018 Public Hearing
- Video of June 6 Public Hearing
- May 17 Presentation of Alternative Site Study Report
- Video of May 17 Joint Board Meeting on the Alternative Site Study
- Legal Summary provided to the Board Members - Prepared by the Office of Town Counsel
- Environmental Site Assessment - Phase 1 - 400 Heath Street
Communication from Board Members about Options to Consider
- Memo from David Pollak on Possible Scenarios to Move Forward - May 29, 2018
- Memo from Advisory Committee Member John Doggett to board members - May 29, 2018
Evaluation Criteria Summaries for each Option
- 9th School Options
- Baker School Options
- Baker K5/678 - Addition of new Upper School; renovation of Lower School
- Baker 5 - Expansion and renovation into a 5-section school
- Baker 3/3 Option 1 - Build a new 3-section school and renovate existing school to become a 3-section school
- Baker 3/3 Option 2 - Build a new 3-section school and rebuild major portions of existing school to make it a 3-section school
- Pierce School Options
- Pierce K5/678 - Addition of a new three-grade building; range of renovations for existing school
- Pierce 5 Option 1 - Expand into a 5-section school by replacing C Wing with a new building
- Pierce 5 Opton 2 - Expand into a 5-section school by building a new three-grade building
- Pierce New 3/3 - Build two new 3-section schools
- Driscoll Option - Renovate and expand into a 4-section school
- Heath Option - Expand into a 4-section school
Transportation Impact Assessments
Earlier Materials and Presentations from the Alternative Site Study
- School Committee Update - March 22, 2018
- School Committee Update - March 8, 2018
- Select Board Presentation on Existing School Site Options - February 20, 2018
- Presentation to School Committee on Existing School Site Options - February 15, 2018
- Public Meeting on Mid-point Progress on Existing School Site Options - February 12, 2018
- Mid-point Progress Update to Select Board and School Committee on Existing School Site Options - February 8, 2018
- Update Presentation from Listening Sessions
- Summary of Comments - Pierce School, January 10, 2018
- Summary of Comments - Lincoln School, January 12, 2018
- Project Update from Superintendent Bott to PSB Families - sent via email on December 22, 2017
- Project Timeline - December 19, 2017
- December Project Update (presented by Dr. Joe Connelly to Select Board on December 19, 2017)
- Summary of Budget for 9th School Further Site Study - December 15, 2017
- November Project Update - November 30, 2017
- Fall 2017 Town Meeting (Night 1) video from Brookline Interactive Group -- 9th School discussion begins at 34:06
Feasibility Phase Studies and Presentations: December 2016 - May 2017
- Narrated video of initial design
- Town Meeting Joint Motion
- Remarks from Building Committee Co-Chair, Neil Wishinsky
- Presentation of Interior Drawings by Jonathan Levi
- 2020 K-8 Enrollment Projection Geographic Distribution Map
- Results from Family Feedback Survey on Student Arrival and Drop off at School
- Additional Conceptual Drawing
- Draft Preferred Schematic Report
- April 27, 2017 - Advisory Committee Meeting - Capital Subcommittee Report on FY18 CIP Request for Schematic Design funds for 9th School
- April 25, 2017 - Building Committee Meeting - Presentation by JLA, Summary of Parking Available, Traffic Safety and Mitigation Policy Guidance, Traffic Simulation Model presented by John Doggett
- April 4, 2017 - Parks and Recreation Commission Meeting - Presentation by JLA
- March 28, 2017 - Building Committee Meeting - Presentation by JLA
- March 6, 2017 - Community Open House Meeting - Presentation by JLA
- March 6, 2017 - Community Open House Meeting - Design Alternative Drawings
- March 6, 2017 - Community Open House Meeting - Soule Addition Drawing
- February 28, 2017 - Building Committee Meeting - Draft Evaluation Matrix for 9th School Design Alternatives
- February 14, 2017 - Building Committee Meeting - Traffic Study Presentation by VAi
- February 14, 2017 - Draft Traffic Study and Appendix
- February 2, 2017 - School Committee Meeting - School Committee Workshop Agenda and Superintendent's Recommendation on School Size
- February 2, 2017 - Draft Space Summary for 3-Section School
- February 2, 2017 - Draft Space Summary for 4-Section School
- January 24, 2017 - Building Committee Meeting - Presentation by JLA
- January 10, 2017 - Building Committee Meeting - Presentation by JLA
- January 9, 2017 - Community Meeting Kickoff of Feasibility Phase - Presentation
- January 4, 2017 - Community Meeting on Traffic Concerns - Presentation
- December 14, 2016 - Building Committee Meeting - Presentation by JLA
Site Selection -- Studies and Presentations: November 2015 - October 2016
Below are links to presentations and studies related to the 9th Elementary School Site Selection.- Updated Traffic Memo submitted by Jonathan Levi Architects and Vanasse & Associates on October 7, 2016
- July 26, 2016 JLA present progress on Site Selection Study
- June 14, 2016 Presentation with JLA update on Site Selection Study
- June 7, 2016 Presentation at Joint Board Meeting on Timeline for School Site Selection
- FAQs regarding the school site selection and other useful information
- RFQ for 9th School Site Studies
- RFQ for the feasibility study for both the 9th School and the BHS - June 2016
Prior Studies and Plans:- 2009 Facilities Master Plan created by MGT
Updated in 2011 with support by MGT - 2013 Brookline School Population and Capacity Exploration (B-SPACE) Committee
Included 2013 Feasibility Study by HMFH Architects
Resulted in recomitment to “Expand-in-Place” Strategy - 2014 Override Study Committee Report included demographic projections done by MIT team
- Dec 2014 – Civic Moxie commissioned to do study on possible locations for 9th elementary school
- Civic Moxie Presentation - October 2015
-
9th Elementary School Documents
2017-18 Enrollment Projection Report (K-12)
Superintendent Bott's Recommendation to the School Committee for a 3-section "plus" 9th Elementary School
Memo on Redefining School Boundaries (10/3/2016)
2017 9th School Feasibility Study Report